|
Monthly Newsletter Left Menu
|
Integrity
Management on TAPS
Controlling pipeline operations
The controllers on duty at the Operations Control Center (OCC)
are accountable for the safe, efficient, effective, and reliable
use of all facilities on the 800-mile-long pipeline system. The
OCC is the brain-center for pipeline and terminal operations.
From here, all the systems required to operate TAPS can be
“seen” on monitors and controlled remotely. Pipeline, pump
station and Valdez Marine Terminal pressures, flows, tank
levels, and hydraulic gradients are all monitored by controllers
to ensure pipeline system integrity. Controllers monitor more
than 4,100 points along the pipeline and directly control 800 of
those points. Alyeska is currently relocating its OCC to
Anchorage from Valdez.
|
 |