|
Monthly Newsletter Left Menu
|
Integrity
Management on TAPS
Communications
From the new Operations Control Center (OCC) to the Unified
Plan project, Alyeska is making long-term investments to ensure
the future operability of the Trans Alaska Pipeline System
(TAPS).
In January 2008, Alyeska’s OCC moved from Valdez to Anchorage
and began operating full time after several months of testing
communications networks, control systems and applications. OCC
controllers can instantaneously monitor and control all
significant aspects of operation, including leak detection, oil
movement and the loading of tankers, 24 hours a day.
The communication control system that runs along the pipeline
from Pump Station 1 to the Valdez Marine Terminal is designed
for triple redundancy protection, utilizing digital microwave,
fiber optic cable and satellite control communications channels.
The multiple mediums ensure the quick and reliable transfer of
information throughout TAPS.

|
 |