Kevin Hostler, President and CEO
HOW ARE WE DOING
This
month’s Alyeska newsletter has a new look and feel, but its
contents remain the same: Stories and information about the
projects and people that make the Trans Alaska Pipeline System
an important and special part of the state of Alaska.
The pipeline itself is getting a new look and feel too, as we
move forward with our Strategic Reconfiguration project. This
large-scale effort is modernizing the pipeline, replacing
30-year-old pump station equipment with newer, more efficient
pumps and control systems. Already, these new pumps are moving
oil at Pump Stations 3 and 9, and we’ve started Strategic
Reconfiguration work at Pump Station 4. Pump Station 1 will be
the final station to undergo this mechanical makeover, and we
believe the end result will be a pipeline that stands prepared
for another generation of safe and reliable operations.
This is an exciting and dynamic time to be a part of Alyeska and
helping position the company for the next 30 years.
|
 |