About us Press Releases Pipeline Facts Safety & Environment Strategic Reconfiguration Employment search
 



Alyeska Reports
Press Releases
Latest News
Technical Papers
Alyeska Monthly




tpublications.gif (1215 bytes)

2008 Alyeska Monthly Newsletters

JULY
Feature Story: Rocking the boat: Technician's kayak commute makes waves
In the field: Pump Station 9 control room spends nights alone, marking milestone
President's message: Permafrost conference celebrates construction of TAPS
Face to face with Tom Betz, Learning and Development Coordinator
Pipeline 101: Spill prevention and response in Prince William Sound
   
JUNE
Feature Story: Alyeska 12th Annual Track and Field Day
In the field: Remote Gate Valve 72 replacement project
President's message: How are we doing?
Face to face with Julia Redington, Project Manager
Pipeline 101: Valves on TAPS
   
MAY
Feature Story: TAPS teams bring health and safety messages to remote communities
In the field: Loading tankers at the Valdez Marine Terminal
President's message: Connecting with Alaska's communities
Face to face with Tammy Holmes, Marine Technician
Integrity Management on TAPS: Ensuring safe operations and system integrity on TAPS
   
APRIL
Feature Story: Crews repair corrosion areas identified by pigging data
In the field: Out of the dark: Alyeska conducts spill exercise during nighttime hours
President's message: Progress continues on Strategic Reconfiguration upgrade project
Face to face with Steve Goudreau, Ballast Water Treatment Supervisor
Integrity Management on TAPS: Communications along the Trans Alaska Pipeline System
   
FEBRUARY
Feature Story: Vapor control starts on new tanks at BWT facility
In the field: Reconfigured pumps at PS 9 reach one year milestone
President's message: Valdez project offers environmental, safety benefits
Face to face with Kathy Zinn, Valdez Marine Terminal Director
Integrity Management on TAPS: Ballast Water Treatment
 
   

JANUARY
Feature Story: Upgraded pumps move oil at Pump Station 3
In the field: New Operations Control Center begins 24/7 operations
President's message: Investing in the next 30 years
Face to face with Adam DeWolf, Enterprise Network Manager
Integrity Management on TAPS: Pipeline and Permafrost

 
Alyeska Pipeline Service Company - P.O. Box 196660, Anchorage, AK, 99519-6660
(907) 787-8700; alyeskamail@alyeska-pipeline.com
Copyright 2003 Alyeska Pipeline Service Company. All Rights Reserved.