
Yukon River
- Bridge
Construction dates 1974-1975
Cost $30 million (of which the Owner
Companies' share was approx. $10 million)
Dimensions
- Length 2,295 ft.
- Road deck width 30 ft.
Grade 5.99°
Location in pipeline MP 353.3
Monument to E.L. Patton dedicated
Oct. 1982
Name of bridge Officially named
"E.L. Patton Yukon River Bridge" by Alaska Legislature in 1982, after E.L.
Patton, President of Alyeska during pipeline construction.
Opening Date Oct. 1979
- River width
1,900 ft. (typical)
|